MISSION DATE: July 27, 1944
MISSION NBR. 112
TARGET: Budapest, Hungary - Manfred Weiss Armament Works
I. CHRONOLOGY
Twenty-seven
B-24's took off at 0530-0556 hours to bomb the Manfred Weiss Armament Works,
Budapest, Hungary. There were no early
returns. Twenty-five dropped 62 tons of
500 lb G.P. bombs on target at 0945 hours from 20,000 – 22,000 feet. One returned 2 tons to base when low flying
aircraft prevented dropping on aiming point.
One was hit by flak just before bomb release line was reached and
crashed in flames. One landed at Vis
because flak damage prevented it retuning to base with formation.
II. ROUTE AND ASSAULT
Rendezvoused
with the 449th Bomb Group on course to San Vito at 7000 feet at 0643
hours and with the 376th and 98th Bomb Groups at San Vito
on course to keypoint, Scedro Isle.
15-20 P-38's met formation at 0900 hours at 25,000 feet, 46.08N-17.18E, departed
1050 hours at 21,000 feet. Rendezvous
was effected with briefed escort consisting of 20-30 P-51's at Lake Balaton at
0915 hours at 24,000 feet. Penetration,
target, and withdrawal cover was provided.
Escort left formation at 1120 hours at 12,000 feet. Briefed route was flown to I.P. (Biscske).
Target was attacked on axis of 102 degrees True, from 22,000 feet. Formation rallied right to avoid flak area,
thence to keypoint (Scedro Isle) to base.
Enroute to and from
the target, visibility was 15 miles with 3/10 to 6/10 strato-cumulus at 23,000
feet. At the target, weather was CAVU
with very slight haze.
III. RESULTS
The
north portion of the target was obscured by smoke from previous bomb bursts
making visual observation difficult.
Photographic interpretation disclosed both the old and new power station
at E-12 received a
concentration of bursts at
E-8. A direct hit was made on one in unidentified
building at E-12. The majority of bursts appeared to be short
of the target and somewhat scattered over the Danube east shore. Above references are to Target
Chart No. 12-3NA.
IV.
ENEMY RESISTANCE
A. Fighters: No encounters.
B. Flak: Intense, accurate, heavy flak was experienced over the target. At the I.P. (Biscske) flak was moderate,
inaccurate, and heavy. Moderate,
accurate, heavy flak was also received from Veszprem. One aircraft was lost to flak just prior to bomb release line.
V.
OBSERVATIONS
At
0931 hours at 47.06N-17.38E
from 22,500 feet, a B-24 was observed to be aflame as result of flak hit. Seven chutes were seen to leave this ship
before it disintegrated. At 0945 hours
at 22,000 feet, another B-24 was hit by flak causing a fire in No. 3
engine. Fire was extinguished and ship
remained with formation.
VI. CASUALTIES
One aircraft lost to flak. Three
crew members were slightly wounded by flak.
Seven aircraft received minor flak damage.
VII FLIGHT LEADERS:
McWhorter Schirmacher Gilday Bozzo